info@newsensetechnology.com

Projects

Selected installations across steel groups, coking plants and rail terminals.

GDK-800 32-Wheel Dynamic Molten Iron Scale
Angang Steel (Metrology Plant)

GDK-800 32-Wheel Dynamic Molten Iron Scale

An 800 t class, 32-wheel dynamic molten iron scale delivered to Angang’s central metrology plant — one of the largest tonnage installations…

2020 · China
400 t Dynamic Rail Weighbridge
Panzhihua Steel & Vanadium

400 t Dynamic Rail Weighbridge

Complete rail weighing system for trade settlement at the vanadium works, including continuous-rail deck, strain-gauge sensor groups and weighing terminal.

2019 · China
600 t Pit-Free Dynamic Rail Weighbridge
Baosteel (Guangxi Fangchenggang Base)

600 t Pit-Free Dynamic Rail Weighbridge

A 600 t pit-free continuous-rail weighbridge for the coastal steel base, weighing full wagon consists in motion at up to 25 km/h…

2020 · China
Trade Weighing Rail Weighbridge Overhaul — Bogie Mode
Masteel Mining (Maanshan Iron & Steel)

Trade Weighing Rail Weighbridge Overhaul — Bogie Mode

Full overhaul of the trade-weighing rail weighbridge, re-commissioned in bogie mode with re-calibrated strain-gauge sensor sets and upgraded data acquisition. The installation…

2021 · China
In-Motion Wagon Weighing for Export Terminal
Rail Logistics Terminal

In-Motion Wagon Weighing for Export Terminal

A dual-deck pit-free weighbridge weighs export wagons at up to 25 km/h, with automatic wagon identification and customs-ready weigh tickets.

2024 · Kazakhstan
Torpedo Car Weighing & Molten Iron Level Monitoring
Steel Group, Southeast Asia

Torpedo Car Weighing & Molten Iron Level Monitoring

Eight torpedo cars were equipped with dynamic weighing and weighing-based level meters, replacing radar gauges that failed in steam and dust.

2023 · Vietnam
3 Mt/a Coal-Coking Project — Rail Weighing Package
Ningxia Baofeng Energy

3 Mt/a Coal-Coking Project — Rail Weighing Package

Six pit-free dynamic rail weighbridges, coal tower scales and oven machine positioning were delivered for a 3 Mt/a coking complex, commissioned within…

2022 · China

Tell Us Your Load, Track and Accuracy Requirements

Send us the wagon type, speed range, capacity and site conditions — our engineering team replies with a configuration proposal within 24 hours.

Contact Engineering